Saturday, April 24, 2010

Internship Life 3

Internship third week already over and I feel that the time goes quickly. This week i learn the process of assembly bucket of excavator. Even though both the bucket and the arm are heavy and have a large size, but we manage to assembly it in short time. The way is with the use of machine such as fork lift. After we assembly it, we still can adjust the clearance between the arm and the bucket using the thin plate. The second task i learn is added up the Racor filter as a diesel pre-filter before connect to the original fuel filter. By the way, we need to exchange and add up fuel hose on it.

No comments:

Post a Comment